Customization: | Available |
---|---|
After-sales Service: | After-Sales One-Stop Service |
Warranty: | 1 Year |
Shipping Cost: | Contact the supplier about freight and estimated delivery time. |
---|
Payment Methods: |
![]() ![]() ![]() ![]() ![]() ![]() ![]() ![]() ![]() ![]() ![]() ![]() |
---|---|
Support payments in USD |
Secure payments: | Every payment you make on Made-in-China.com is protected by the platform. |
---|
Refund policy: | Claim a refund if your order doesn't ship, is missing, or arrives with product issues. |
---|
Suppliers with verified business licenses
Audited by an independent third-party inspection agency
The QDPP Integrated Sewage Treatment Equipment, crafted from a cutting-edge high-molecular material, is ingeniously molded into a singular tank structure. This seamless design is a testament to the excellence of its raw materials.
With unparalleled innovation, the Zhong Qiao Enlightenment R&D team has surmounted design challenges, leveraging and refining advanced Western technologies for this exemplary tank.
Tailored to meet the unique sewage conditions and discharge standards of rural China, our remarkable range of integrated sewage treatment equipment includes the pioneering Zhong Qiao Tank Horizontal Tank A/B, Vertical Tank A/B, and the state-of-the-art Hollow Tank.
Polypropylene (PPH) Performance Table | |||
Item | Typical Value | Unit | Test Method |
Density | 905 | k/m3 | ISO 1183 |
Melt Flow Rate (230°C/2.16 kg) | 0.3 | g/10 min | ISO1133 |
Melt Flow Rate (190ºC/5.0kg) | 0.6 | g/10 min | ISO 1133 |
Yield Stress (50 mm/min) | 36 | MPa | ISO 527-2 |
Yield Strain (50 mm/min) | 10 | % | ISO 527-2 |
Tensile Modulus (1 mm/min) | 1650 | MPa | ISO 527-2 |
Charpy Impact Strength, Notched (+23°C) | 7 | KJ/m² | ISO 179/1eA |
Notched Impact Strength (-20°C) | 2 | KJ/m² | ISO 179/1eA |
Vicat Softening Temperature B (50N) | 95 | ºC | ISO 306 |
Model | Treatment Capacity (m³/d) | Dimensions (L x W x H) (m) | Equipment Weight (t) |
Operating Weight (t) |
Total Installed Power (kw) |
Operating Power (kw) | Operating Cost (CNY/ton of water) | Operating Cost (CNY/day) | Cable Specification (mm²) | Equipment Footprint (m²) |
WSZ-0.25 | 5 | φ2×4.7m | 0.67 | 14.07 | 7.45 | 4.1 | 7.38 | 36.9 | 4 | 19 |
WSZ-0.5 | 10 | φ2×4.8m | 0.68 | 14.38 | 7.45 | 4.1 | 3.69 | 36.9 | 4 | 20 |
WSZ-1 | 20 | φ2×5.3m | 0.97 | 16.27 | 9.25 | 5 | 2.25 | 45 | 6 | 24 |
WSZ-1.25 | 30 | φ2×6.2m | 1.05 | 19.15 | 9.25 | 5 | 1.5 | 45 | 6 | 27 |
WSZ-1.67 | 40 | φ2.5×6m | 1.45 | 27.9 | 9.85 | 5.3 | 1.2 | 47.7 | 6 | 31 |
WSZ-2 | 50 | φ2.5×6.6m | 1.6 | 31.5 | 9.85 | 5.3 | 0.95 | 47.7 | 6 | 40 |
WSZ-2.5 | 60 | φ2.5×7.3m | 1.7 | 35 | 9.85 | 5.3 | 0.8 | 47.7 | 6 | 39 |
WSZ-3 | 70 | φ2.5×8.1m | 1.9 | 39.1 | 9.85 | 5.3 | 0.68 | 47.7 | 6 | 43 |
WSZ-3.5 | 80 | φ 2.5×8.8m | 2 | 42.7 | 11.45 | 6.1 | 0.69 | 54.9 | 6 | 48 |
WSZ-4 | 100 | φ2.5×10.3m | 2.4 | 50.4 | 12.95 | 6.85 | 0.62 | 61.65 | 10 | 53 |
WSZ-5 | 120 | φ3×9.2m | 2.8 | 63.6 | 15.65 | 8.2 | 0.615 | 73.8 | 10 | 58 |
WSZ-6 | 150 | φ3×10.8m | 3.1 | 75.2 | 15.65 | 8.2 | 0.49 | 73.8 | 10 | 67 |
WSZ-7 | 170 | φ3×11.9m | 3.5 | 83.4 | 18.65 | 9.7 | 0.51 | 87.3 | 10 | 71 |
WSZ-8 | 200 | φ3×13.6m | 4 | 95.9 | 22.35 | 10.8 | 0.486 | 97.2 | 16 | 81 |
WSZ-10 | 250 | φ3×16.4m | 5 | 116.7 | 25.9 | 13.5 | 0.486 | 121.5 | 16 | 102 |
WSZ-12.5 | 300 | φ3×10.2m 2 units | 5.7 | 137.1 | 25.9 | 13.5 | 0.4 | 121.5 | 16 | 116 |
WSZ-15 | 360 | φ3×12.2m 2 units | 6.9 | 166.6 | 35.5 | 18.5 | 0.46 | 166.5 | 25 | 133 |
WSZ-17 | 400 | φ3×13.3m 2 units | 7.7 | 183 | 35.5 | 18.5 | 0.42 | 166.5 | 25 | 145 |
WSZ-20 | 500 | φ3×16.1m 2 units | 9.7 | 224.5 | 35.5 | 18.5 | 0.33 | 166.5 | 25 | 173 |
Processing parameter requirement | ||
Parameters/Index |
Inflow water quality mg/L(ppm) |
Outflow water requirement mg/L(ppm) |
COD | ||
BOD | ||
TSS | ||
Ammonia nitrogen |
||
TN | ||
TP | ||
PH | ||
E.coli |
||
Others |
||
Water flow |
m³/d |
|
On/Underground | If underground,pls indicate the depth | |
If integrated with control room |
||
Appearance requirement |
Simple appearance, container appearance, Zhong qiao container appearance, please refer to our brochure for details | |
Voltage, HZ, Electric phase |
||
Distance between regulating pool and equipment |
||
Flange interface specifications |
||
Special requirements |